Setting up safe verges
On the A1, the Go-Barry drove along on the hard shoulder and allowed an infiltration sewer to be laid safely on the verge . During the nights, the Go-Barry was on lane 2 to enable the supply of materials.
Edition: Go-Barry SMTB 200 - 204 m length
Implementation time: 2.5 weeks