N243 Noordervaart
Deployment of the Go Barry as a dynamic barrier that rides along with piling operations. The Go Barry rides on the grass concrete tiles next to the provincial road to protect the piling work in the embankment of the road. Every day, the barrier is moved 30 to 40 metres.
Version: Go Barry 0.5 42m length
Implementation time: 6 to 8 months